{"id":13663,"date":"2025-10-01T17:58:15","date_gmt":"2025-10-01T15:58:15","guid":{"rendered":"https:\/\/www.trt.it\/?post_type=portfolio&#038;p=13663"},"modified":"2025-12-12T16:46:53","modified_gmt":"2025-12-12T15:46:53","slug":"urban-traffic-plan-of-the-municipality-of-piacenza","status":"publish","type":"portfolio","link":"https:\/\/www.trt.it\/en\/progetti\/urban-traffic-plan-of-the-municipality-of-piacenza\/","title":{"rendered":"Urban Traffic Plan of the Municipality of Piacenza"},"content":{"rendered":"\n<h4 class=\"wp-block-heading\">Update of the Urban Traffic Plan (UTP) of the Municipality of Piacenza, a short-term (two-year) implementation tool of the Sustainable Urban Mobility Plan<\/h4>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-medium\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"187\" src=\"https:\/\/www.trt.it\/wp-content\/uploads\/2025\/10\/PUT-Piacenza-3-300x187.png\" alt=\"\" class=\"wp-image-13669\" srcset=\"https:\/\/www.trt.it\/wp-content\/uploads\/2025\/10\/PUT-Piacenza-3-300x187.png 300w, https:\/\/www.trt.it\/wp-content\/uploads\/2025\/10\/PUT-Piacenza-3-121x75.png 121w, https:\/\/www.trt.it\/wp-content\/uploads\/2025\/10\/PUT-Piacenza-3.png 429w\" sizes=\"auto, (max-width:767px) 300px, 300px\" \/><\/figure><\/div>\n\n\n<p>The Municipality of Piacenza has commissioned TRT to draft the monitoring report for the Sustainable Urban Mobility Plan (SUMP) (document submitted and registered on 10\/08\/2023) and to update the Urban Traffic Plan (UTP).<\/p>\n\n\n\n<p>The UTP is a short-term implementation plan (covering a two-year period) aimed at carrying out the interventions foreseen in the Short-Term Scenario of the SUMP. The development of Piacenza\u2019s UTP follows the guidelines set out in the Ministerial Directives of 1995 and the most recent updates to the Italian Highway Code.<\/p>\n\n\n\n<p>The monitoring of the SUMP lays the foundation for selecting the interventions that define the scenarios of the UTP. In fact, the document reports on the updated state of urban mobility in Piacenza, assessing the progress and impacts of the actions taken since the approval of the SUMP in December 2020.<\/p>\n\n\n\n<p>Based on this evidence, the most consistent interventions with the SUMP&#8217;s short-term scenario (2\u20133 years) have been selected. This selection also considered existing planning tools, such as the 2024\u20132026 Three-Year Public Works Program, the Cycling Plan (approved on 17\/04\/2023), the Smart City Plan (October 2019), the Environmental Noise Action Plan, and other strategic documents.<\/p>\n\n\n\n<p>The UTP was developed in three main phases:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The definition of the objectives of the UTP, aligned with the objectives and strategies of the current SUMP;<\/li>\n\n\n\n<li>The definition of the Reference Scenario (SR), consisting of interventions considered unchanging over the two-year validity period of the UTP, and serving as the starting point and benchmark for the UTP design;<\/li>\n\n\n\n<li>The proposal of the Plan Scenario (SP), which is a set of measures consistent with the goals of the PUT, addressing both the supply of networks and services and the policies for managing mobility demand.<\/li>\n<\/ul>\n\n\n\n<p>With Municipal Resolution No. 23 of 11 February 2025, the Draft Plan was adopted. Following the 30-day period dedicated to public consultation, and the related replies\/amendments, the Plan was definitely approved by the Municipal Council with Resolution No. 25 of 22\/09\/2025.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"507\" height=\"698\" data-id=\"13665\" src=\"https:\/\/www.trt.it\/wp-content\/uploads\/2025\/10\/PUT-Piacenza-1.png\" alt=\"\" class=\"wp-image-13665\" srcset=\"https:\/\/www.trt.it\/wp-content\/uploads\/2025\/10\/PUT-Piacenza-1.png 507w, https:\/\/www.trt.it\/wp-content\/uploads\/2025\/10\/PUT-Piacenza-1-218x300.png 218w, https:\/\/www.trt.it\/wp-content\/uploads\/2025\/10\/PUT-Piacenza-1-54x75.png 54w, https:\/\/www.trt.it\/wp-content\/uploads\/2025\/10\/PUT-Piacenza-1-480x661.png 480w\" sizes=\"auto, (max-width:767px) 480px, 507px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"492\" height=\"698\" data-id=\"13667\" src=\"https:\/\/www.trt.it\/wp-content\/uploads\/2025\/10\/PUT-Piacenza-2.png\" alt=\"\" class=\"wp-image-13667\" srcset=\"https:\/\/www.trt.it\/wp-content\/uploads\/2025\/10\/PUT-Piacenza-2.png 492w, https:\/\/www.trt.it\/wp-content\/uploads\/2025\/10\/PUT-Piacenza-2-211x300.png 211w, https:\/\/www.trt.it\/wp-content\/uploads\/2025\/10\/PUT-Piacenza-2-53x75.png 53w, https:\/\/www.trt.it\/wp-content\/uploads\/2025\/10\/PUT-Piacenza-2-480x681.png 480w\" sizes=\"auto, (max-width:767px) 480px, 492px\" \/><\/figure>\n<\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Update of the Urban Traffic Plan (UTP) of the Municipality of Piacenza, a short-term (two-year) implementation tool of the Sustainable Urban Mobility Plan The Municipality of Piacenza has commissioned TRT to draft the monitoring report for the Sustainable Urban Mobility Plan (SUMP) (document submitted and registered on 10\/08\/2023) and to update the Urban Traffic Plan (UTP). The UTP is a short-term implementation plan (covering a two-year period) aimed at carrying out the interventions foreseen in the Short-Term Scenario of the SUMP. The development of Piacenza\u2019s UTP follows the guidelines set out in the Ministerial Directives of 1995 and the most recent updates to the Italian Highway Code. The monitoring of the SUMP lays the foundation for selecting the interventions that define the scenarios of the UTP. In fact, the document reports on the updated state of urban mobility in Piacenza, assessing the progress and impacts of the actions taken since the approval of the SUMP in December 2020. Based on this evidence, the most consistent interventions with the SUMP&#8217;s short-term scenario (2\u20133 years) have been selected. This selection also considered existing planning tools, such as the 2024\u20132026 Three-Year Public Works Program, the Cycling Plan (approved on 17\/04\/2023), the Smart City Plan (October 2019), the Environmental Noise Action Plan, and other strategic documents. The UTP was developed in three main phases: With Municipal Resolution No. 23 of 11 February 2025, the Draft Plan was adopted. Following the 30-day period dedicated to public consultation, and the related replies\/amendments, the Plan was definitely approved by the Municipal Council with Resolution No. 25 of 22\/09\/2025.<\/p>\n","protected":false},"author":5,"featured_media":13672,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false},"portfolio-types":[237,243],"class_list":["post-13663","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio-types-planning","portfolio-types-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/portfolio\/13663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/comments?post=13663"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/media\/13672"}],"wp:attachment":[{"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/media?parent=13663"}],"wp:term":[{"taxonomy":"portfolio-types","embeddable":true,"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/portfolio-types?post=13663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}