{"id":11440,"date":"2015-06-10T10:00:13","date_gmt":"2015-06-10T08:00:13","guid":{"rendered":"http:\/\/www.trt.it\/wp\/en\/PROGETTI\/strada-dei-parchi\/"},"modified":"2025-10-08T09:17:36","modified_gmt":"2025-10-08T07:17:36","slug":"a24-and-a25-motorways","status":"publish","type":"portfolio","link":"https:\/\/www.trt.it\/en\/progetti\/a24-and-a25-motorways\/","title":{"rendered":"A24 and A25 motorways"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1016 size-full\" src=\"https:\/\/www.trt.it\/wp-content\/uploads\/2016\/10\/870_strada_parchi.png\" alt=\"TRT - Strada dei parchi\" width=\"870\" height=\"540\" srcset=\"https:\/\/www.trt.it\/wp-content\/uploads\/2016\/10\/870_strada_parchi.png 870w, https:\/\/www.trt.it\/wp-content\/uploads\/2016\/10\/870_strada_parchi-300x186.png 300w, https:\/\/www.trt.it\/wp-content\/uploads\/2016\/10\/870_strada_parchi-768x477.png 768w, https:\/\/www.trt.it\/wp-content\/uploads\/2016\/10\/870_strada_parchi-260x161.png 260w\" sizes=\"auto, (max-width:767px) 480px, (max-width:870px) 100vw, 870px\" \/><\/p>\n<h4>Transport and cost-benefit analysis for the feasibility study of the adjustment of the A24 and A25 motorways in Italy<\/h4>\n<p>The study included the following activities:<\/p>\n<ul>\n<li>transport analysis of A24 and A25 motorways through the use of the AIMSUN simulation model to evaluate the impacts resulting from the implementation of some route alternatives;<\/li>\n<li>accessibility analysis in the current conditions, in the project scenario and in relation to the construction phases with particular regard to safety conditions;<\/li>\n<li>cost-benefit analysis of alternative scenarios of the planned interventions for the two highways, combined with the risk analysis of some variables such as growth in traffic demand over time.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<hr \/>\n","protected":false},"excerpt":{"rendered":"<p>Transport and cost-benefit analysis for the feasibility study of the adjustment of the A24 and A25 motorways in Italy The study included the following activities: transport analysis of A24 and A25 motorways through the use of the AIMSUN simulation model to evaluate the impacts resulting from the implementation of some route alternatives; accessibility analysis in the current conditions, in the project scenario and in relation to the construction phases with particular regard to safety conditions; cost-benefit analysis of alternative scenarios of the planned interventions for the two highways, combined with the risk analysis of some variables such as growth in traffic demand over time. &nbsp;<\/p>\n","protected":false},"author":1,"featured_media":988,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":true},"portfolio-types":[229,243],"class_list":["post-11440","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio-types-assessment","portfolio-types-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/portfolio\/11440","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/comments?post=11440"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/media\/988"}],"wp:attachment":[{"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/media?parent=11440"}],"wp:term":[{"taxonomy":"portfolio-types","embeddable":true,"href":"https:\/\/www.trt.it\/en\/wp-json\/wp\/v2\/portfolio-types?post=11440"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}